Works begins on Edward Woods

edward woodsWork has begunĀ  on the green recladding of the blocks in the Edward Woods estate.

The refurbishment of the 24 blocks involves recladding with insulated panels, and installing a selection of energy generating elements – solar panels and wind turbines – to generate enough power to run communal lighting, lifts, CCTV and door entry systems.

The refurbishment was designed by ECD Architects. See previous coverage.

This entry was posted in General. Bookmark the permalink.